Site selection based on techno-economic considerations for power/other projects, , preparation of Techno-economic Feasibility report, DPR, Rehabilitation & Resettlement Plan, various statutory & non-statutory clearances, Power evacuation plan, Power Trading, Long Term Open Access, Short Term Open Access, Construction of Transmission line and EHV S/s on EPC etc. including forest clearance from MoEF for the following:-

(A) RELATED TO EXECUTION OF EHV TRANSMISSION LINES AND SUBSTATIONS WORKS (ON EPC Basis)

I.Work already completed
S.N.Name of ClientsCapacityName of Work
1M/s MSP Steel & Power Ltd..35 MWTransmission Line 132 kV - 26 Kms along with forest approval & other statutory approvals
2M/s R. R. Energy Ltd..15 MWTransmission Line 132 kV - 11 Kms & statutory approvals
3M/s Sarda Energy & Minerals Ltd.Steel Plant CD-20MVATransmission Line 132 kV - 4 Kms
Statutory approvals
4M/s Shri Bajrang Metallics & Power Ltd..CPP 24MVATransmission Line 132 kV - 4 Kms
5Arya Energy Ltd., Kotma (M.P)12 MW
Biomass
Power plant
(i) 1.2 kms transmission line
(ii) 132 kV S/s Switchyard
(iii)132 kV Bay at MPPTCL S/sKotma
6Alstom T & D India Ltd..For CSPTCL,
Chhattisgarh
Construction of 220 Sub-station at
Chhuri with 18 Nos. 220 kV Bays &
13 Nos. 132 kV Bays
7MSP Sponge Iron Ltd..Steel Industry
CD-20MVA
132 kV S/s at Manupali,Raigarh
8M/s Chhattisgarh Steel & Power Ltd.3X35 MW(i) 132 kV Transmission Line - 6 Kms
(ii) 132 kV Substation& statutory approvals.
9M/s Ind Synergy Pvt. Ltd.CPP 60 MW132 kV Transmission Line - 22 Kms along with forest approval & other statutory approvals.
10M/s R.K.M Powergen Pvt. Ltd.2X660MWDetailed survey of 400 kV Line - 22 Kms
11M/s Droliya Electro Steels Pvt. LtdCPP 8MWDetailed survey of 132 kV Line – 4 Kms
12M/s Arora Infrastructure Ltd.
Bishrampur
10MW Biomass Power ProjectDetailed Survey of 132 kV Line plus execution of 33 kV line- 6 kms
13M/s Dheeru Powergen Pvt. Ltd.2x660MW IPPDetailed Survey of 400 kV line - 70 Kms
14M/S S K S Ispat & Power Ltd.2x660 MWDetailed survey - 400 kV-25 Kms
15M/S. Prakash Industries Ltd. Champa4X25 MWConstruction of 132 kV Double Ckt line. 20 Kms
16Chief Engineer, EHT (C&M) MPPTCL JABALPURM.P Utility CompanyModification of
(I) 220 kV Sarni-Pandurna line .
(ii) 132 kV Sarni- Chindwara line
(iii) 132 kV Sarni-Betul line
(iii) 132 kV Sarni-Ghodadongari
traction line by using multi-circuit
towers (Labour Contra
17M/s Sarda Energy & Minerals Ltd.2x350 MW
TPP at Kolam
Detailed survey of 400 kV line for
their TPP
18ACME Solar Energy(MP) Pvt.Ltd.,
Khilchipur(MP) under MPPTCL
For Solar Power
Plant
132 kV DCSS line – 10 kms
19Vandana Energy & Steel, Korba(C.G)Thermal Power Plant – 35 MW132 kV line – LILO D/C
20Chief Engineer EHT(C&M), CSPTCL,
Raipur(C.G)
C.G Utility CompanyConstruction of 132 kV DCDS line at
Ratanpur, Bilaspur – 5.1 Kms.(Labour
Contract).
21MPPTCL, Rajgarh(M.P)NTPC line132 kV DCDS line – 4 kms.
22Nagpur Wires & Transformers,NagpurIrrigation ProjectDiversion of 132 kV DCDS Ambazari-Amravati line.
23PowerD EPC Services Limited, Betul
(Under MPPTCL)
50 MW Wind ProjectConstruction of 132 KV Double Circuit
line at Bheinsdehi,Betul,(MP) – 23 kms.
24Shree Mahalaxmi City Homes Pvt. Ltd.Real Estate
Developer
Diversion of 132 kV line from private
land owner
25Chhattisgarh Hydropower LLP,
Raipur
132 kV line – 14 Kms
132 kV LILO- 1.5 Kms
132 kV LILO + Diversion for 132 kV
Pooling Substation at Lodhma.- total 15.5 Kms.
26Chhattisgarh Hydropower LLP, Raipur24 MW Hydro Power PlantWork is in progress – 15 Kms(including . LILO & Diversion Work)
27MPPTCL132 kV line for Railways at Amla (Distt.Betul)- 24 KmsWork completed
28Avantha Power & Infrastructure Ltd. Raigarh1320 MW
Power Plant
For modification of 765 kV,
400 kV, 220 kV & 132 kV lines for
their Railway crossing – survey thereof.
29CSPTCL / Chhattisgarh Hydropower LLP, Raipur132 kV Pooling S/s
at Lodhma
Construction of 132 KV Pooling S/s
at Lodhma
30Chhattisgarh Hydropower LLP, Raipur2x12 MW Hydro Power PlantConstruction of 132 kV Switching S/s at Bene along with the related Engg. & consultancy services.
31PowerD EPC Services Limited, Betul
(Under MPPTCL)
50 MW Wind Project(i) Second Circuitng Work of 23 Kms.
(ii) Construction of 132 KV Bay
32Nagpur Wires & Transformers(Irrigation Project), MaharashtraMokhabardi
Irrigation Project
132 kV DCDS line – 37.5 Kms
33CSPTCL132 DCDS line from 132 kV S/s Gharghoda to NTPC Talaipali Coal Mines,Double Circuit 132 kV – 19 Kms.
34NTPC, LaraShifting of 132 kV line of Ind Synergy Ltd.132 kV line shifting for 2.5 Kms
35M/s Sarda Energy & Minerals Ltd., RaipurModification/Shifting
II. Work in progress
S.N.Name of ClientsCapacityName of Work
1Madhya Bharat Power Corporation Limited.220 kV Double Circuit for Hydal Power Project at SikkimWork under progress
2Madhya Bharat Power Corporation Limited.220KV Substation at SikkimWork under progress
3Hindustan Coils Limited132 KV DCSS kube frin 132 kV metallics line to M/s Hindustan Coils plant, Siltara, Raipur132 kV DCSS line - 11.3km
Work under progress
4Nav Durga Fuels (P) Ltd.132 kV DCSS line from Gervanis to Nav Durga Plant132 kV DCSS line - 8 km
Work under progress

(B) COAL BASED POWER PROJECTS

Abbreviations:

1) SS Site Selection

2) TEFR Techno Economic Feasibility Report

3) OA Other Clearance Activities

4) DPR Detailed Project Report

No.Name of clientsCapacityAssigned workStatus of assigned
work
1M/s OASYS POWER LTD., KOLKATA540 MWSS+TEPFRCompleted
2M/s PATNI PROJECTS PVT. LTD., MUMBAI540 MWSS+TEPFRCompleted
3M/s ZOOM DEVELOPERS PVT. LTD., NEW DELHI1200 MWSS+TEPFRCompleted
4M/s ADITYA BIRLA POWER CO. LTD., MUMBAI1000 MWSS+TEFR + DPRCompleted
5M/s THE INDURE PVT. LTD. (DESEIN), NEW DELHI1000 MWSS+TEFRCompleted
6M/s ANKIT POWERTECH PVT. LTD., RAIPUR540 MWSS+TEFR+OACompleted
7M/s HIND ENERGY & COAL BENEFICIATION PVT. LTD.,BILASPUR70 MWTEFR + SSR + OACompleted
8M/s AES ( INDIA) (P) LTD., GURGAON1200 MWSS+TEFR+OAI In progress
9M/s BLA CHHATTISGARH THERMAL POWER PVT. LTD.,MUMBAI540 MWSS +TEFR+OACompleted
10M/s BEC POWER PVT. LTD., MUMBAI505 MWSS+ TEFR+OA + DPRIn progress
11M/s CHHATTISGARH STEEL & POWER LTD., RAIPUR105 MWSS +TEFR+OA+DPRCompleted
12M/s DCM SHRIRAM CONSOLIDATED LTD., NEW DELHI1200 MWSS +TEFR+OACompleted
13M/s SJK POWERGEN PVT. LTD., HYDERABAD1000 MW (in MP)SS +TEFR+OA + DPRCompleted
14M/s SURYACHAKRA POWER CORP. LTD., HYDERABAD270 MWSS +TEFR+OACompleted
15M/s CHAMBAL INFRASTRUCTURE VETURES LTD., NEW DELHI1200 MWSS +TEFR+OACompleted
16M/s IND-BARATH ENERGIES LTD., HYDERABAD600 MWSS +TEFR+OAIn progress
17M/s SONA POWER PVT. LTD., RAIPUR600 MWSS +TEPFR+OA+DPRIn progress
18M/s JAIN ENERGY (CHHATTISGARH) PVT LTD., KOLKATA1200 MW

1320MW(M.P)
1320 MW(CG)
SS+ TEFR+OA+DPRIn progress
19M/s JSW ENERGY LTD., MUMBAI1200 MW(CG)SS+TEFR+OACompleted
20M/s GVK POWER PVT. LTD., HYDERABAD1200 MWSS+TEPFRCompleted
21M/s TRN ENERGY PVT. LTD. NEW DELHI625 MWSS+ TEFR+OAIn progress
22M/s MW INFRAHOLDINGS PVT. LTD., NEW DELHI540 MWSS+ TEFR+OACompleted
23M/s ECE INDUSTRIES LTD., KOLKATA900 MWSS+ TEFR+OACompleted
24M/s TANISH ARYAN POWER PVT. LTD., MUMBAI600 MWSS+ TEFRCompleted
25M/s LORDS POWER PVT. LTD, RAIPUR70 MWSS+ TEFR+OACompleted
26M/s MSP STEEL & POWER LTD.1000 MW(MP)SS+ TEFR+OACompleted
27M/s Ozone Steel & Power Ltd, Kolkata600 MWSS+ TEFR+DPR+OAIn progress
28Shree Lakshmi Power Limited, Bilaspur100/120 MWSS+ TEFR+OAIn progress
29M/s VEN POWER PVT LIMITED, HYDERABAD1320 MWSS+TEFRCompleted
30SHREE CEMENT LIMITED, BEAWAR, (RAJ)1320 MWSS+TEFRCompleted
31M/S FACOR ALLOYS LIMITED, NEW DELHI350 MWDPR+OAIn progress(MP)
32M/S SKY ALLOYS & POWER PVT LTD, RAIPUR35 MWSS+ TEFRIn progress
33M/S LANCO SOLAR PVT LTD, HYDERABAD (CPP)150 MWSS+ TEFR+OACompleted
34M/S COSMOS CASTING (INDIA) LTD, RAIPUR2 X 250 MWSS+ TEFR+DPR+OAIn progress
35M/S MARS POWER & STEEL LIMITED , RAIPUR (CPP)50 MWSS+ TEFR+OAIn progress
36M/s GMR CHHATTISGARH ENERGY PVT. LTD.1300 MWLTOA, PPA, Start-up power etcIn progress
37S.M. INFRA POWER (I) PVT. LTD. , MUMBAI660 MWSS+ TEFR+DPR+OAIn progress
38M/S. P.R.INFRASTRUCTURE LTD. , CHANDIGARH240 MWSS+ TEFRCompleted
39M/S. HIRA POWER & STEEL LTD. , RAIPUR37.5 MWSS+ TEFRIn progress
40M/S. GONDWANA POWER & STEEL LTD.50MWSS+ TEFR+OAIn progress
41M/S. SONA POWER PVT. LTD. , RAIPUR(660 MW DPR WORK)
Revised –
1320 MW in
CG. TPP
SS+TEFR+OA+DPRIn progress
42M/S J/AIN ENERGY (MP) PVT.LTD.1320 MWSS+TEFR+OA+DPRIn progress
43HCC INFRASTRUCTURE CO.LTD., Mumbai1320 MWSs + TEFR + OAIn progress
44M/S SARDA ENERGY & MINERALS LTD., RAIPUR2x350 MW TPP at Kolam (C.G)(i) Survey of 400 kV line(9.5 kms)
(ii) Consultancy
Completed.

(C) BIOMASS BASED / SOLAR / HYDRO POWER PROJECTS

No.Name of clientsCapacityAssigned workStatus of assigned
work
1M/s Shripur Power Project, Birbera8 MW BiomassProject execution:In progress
2M /S SESHASAILA POWER & ENGINEERING (P)
LTD., RAIPUR
8 MW Champa (C.G.)SS+TEFR +DPR+OACompleted
3M/S SSE NIRMAN PVT LTD, KOLKATA2 X 2 MW (SOLAR)SS +DPR+OACompleted
4M/ S CHHATTISGARH ENERGY CONSORTIUM PVT
LTD., Mahan
Hydro Power Project -5MWFor ConnectivityUnder progress
5M/S MAINPAT ENERGY CONSORTIUM PVT. LTD.,
Mainpat
7.50 MWFor ConnectivityUnder progress
6M/S NORTH EAST HYDRO ENERGY PVT. LTD., Gagar6 MWFor ConnectivityUnder progress
7M/S SHAKAMBARI POWER LTD.1X2MW
(SOLAR)
SS+DPR+OACompleted
8M/S BEYANT HOLDING & FINANCE LTD.1X2MW
(SOLAR)
SS+DPR+OACompleted
9M/S SONA WINES LTD.1X 2MW(Solar)SS+DPR+OACompleted
10M/s AMVENSYS TECH. PVT. LTD., Tilda,Distt.Raipur(C.G1x 2 MW(Solar)Complete consultancyUnder progress
11M/s ABHINAV GREEN POWER (INDIA) PVT.LTD.1X 5 MW (Solar)-do--do-
12M/S CHHATTISGARH STEEL & POWER LTD.1 x 2MW (Solar)-do--do-
13M/S RIGHILL ELECTRICS, BHOPAL1X1 MW(Solar)-do--do-
14M/s Nachiketa Steel & Power, Bilaspur.8 MW Gen. + 30 MW
steel mfg. activities
Feasibility study for 132 kV connectivityCompleted

(D) RELATED TO POWER TRADING / LONG TERM / SHORT TERM OPEN ACCESS

S.N.NAME OF CLIENTSPARTICULAR OF WORKS
1M/s CHHATISGARH STEEL & POWER LTD.(30 MW) Open access/Power Trading
2M/s REAL ISPAT & POWER LTD.STOA / Power Trading
3M/s SKS ISPAT POWER LTD.STOA / Power Trading
4M/s LAHARI POWER & STEEL LTD.STOA / Power Trading
5M/s SHRI BAJRANG POWER & STEEL LTD.STOA /Power Trading
6M/s SINGHAL ENERGY PVT LIMITED , RAIPUR (16 MW)PGCIL/Long Term Open Access
7M/s MARUTI CLEAN COAL & POWER LTD.PGCIL/Long Term Open Access
8M/s MAHENDRA SPONGE IRON & POWER LTD.Short Term Open Access
9M/s RASHMI SPONGE IRON & POWER LTD.Short Term Open Access
10M/s VASHWANI SPONGE IRON & POWER LTD.Short Term Open Access
11M/s GOPAL SPONGE IRON & POWER LTD.Long Term Open Access
12M/s BALDEO SPONGE IRON & POWER LTD.Long Term Open Access
13M/S BHAWATI POWER & STEEL LTD, RAIPURLong Term Open Access
14M/S. AGIO PAPER & INDUSTRIES LTD. , BILASPUR/KOLKATAPower evacuation & Open Access
15M/S. DEVI SPO-NGE & POWER PVT. LTD.Dedicated connectivity & Synchronization of 8 MW & Open Access
16M/s SAI CHEMICALS, RAJNANDGAONPower Trading
17M/s SESHASAILA POWER & ENGINEERING (P)
LTD., RAIPUR
Power Trading / Open access
18M/s ARORA / INDRA POWERGEN (P) LTD.Power Trading / Open access
19M/sMSP STEEL & POWER LTD.Power Trading / Open access
20M/s MAHAVIR ENERGY & COAL BENEFICATION LTD.Power Trading / Open access
21M/s ARYA ENERGY LTD.Consultancy related to Drawing,m Design & connectivity for 132 kV line and S/s and their testing & commissioning.

(E) FOREST CLEARANCE From MOEF

S.N.NAME OF CLIENTSPARTICULAR OF WORKS
1CSPGCL / CSEBFor Power Plant, pertaining to M/s India Bulls 1200 MW TPP (BHAIYATHAN)
2M/s Ind-Synergy Ltd.For Transmission Line
3M/s MSP Steel & Power LtdFor Transmission Line
4M/s BEC Power Pvt. Ltd.Wildlife Clearance

(F) REGULATORY AFFAIR CASES

S.N.NAME OF CLIENTSPARTICULAR OF WORKS
1M/s RR Energy LtdSucceeded in getting refund of 15% supervision charges worth more than Rs. 80.00 Lacs
2M/s Gopal Sponge& Power Ltd.Succeeded in obtaining Open access from CSERC
3M/s Ind Synergy Pvt. Ltd.Succeeded in waival of cross subsidy charges worth Rs. 44.00 Lacs
4M/s Indsynergy Pvt. Ltd.Succeeded in obtaining Open access on 33kVthrough 33/11kV substation
5M/s Biomass power Generation AssociationSucceeded in getting the tariff enhanced by 76 paisa / unit
6M/s Baldev Alloys Pvt.Ltd.Succeeded in obtaining approval of higher load up-to 14 MW on 33 kV
7CREDAIWaival of the cost of 33 / 11 kV S/s being charged from the Builders – Case is in process
8M/s Chhattisgarh Steel & Power Ltd.Refund of excess amount against 132 kV connectivity – Case in progess.