Overhead Electrification (Railway)
| S.N. | Name of Clients | Capacity | Name of Work |
| 1 | SEC Railway, Bilaspur (Joint Venture with M/s Mosh Varya Infrastructure Pvt. Ltd.) | 25 KV, Overhead Electrification (OHE) Work | Electrification works in section between Paniajob (Ex) to Bortalab (Ex) of South East Central Railway in connection with construction of 3rd line between Rajnandgoan- Kalumna |

