EHV TRANSMISSION LINES AND SUBSTATIONS WORKS (ON EPC Basis)
| (A) Our clients related to Transmission lines and Substations only | |||
| S.N. | Name of Clients | Capacity | Name of Work |
| 1 | Sterlite Powergrid Ventures Ltd. | Modification of 765 KV S/c Quad Dhule-Aurangabad Transmission line | Modification work of 765 KV S/c Quad transmission line for National Highway (NHAI) |
| 2 | Chief Engineer, EHT (C&M) MPPTCL JABALPUR | M.P Utility Company | Modification of (I) 220 kV Sarni-Pandurna line . (ii) 132 kV Sarni- Chindwara line (iii) 132 kV Sarni-Betul line (iv) 132 kV Sarni-Ghodadongari traction line by using multi-circuit towers (Labour Contract) |
| 3 | BSCPL Infrastructure Ltd. | National Highway Crossing on Chhattisgarh- Orissa Border | Modification of various lines of 132 KV & 220KV lines for National Highway (NHAI) Crossing |
| 4 | Alstom T & D India Ltd.. | For CSPTCL, Chhattisgarh | Construction of 220 Sub-station at Chhuri with 18 Nos. 220 kV Bays & 13 Nos. 132 kV Bays having Transformer capacity of 160 MVA |
| 5 | Madhya Bharat Power Corporation Limited, Raipur(C.G.) | 220 KV Switchyard work at Sikkim | Construction of 220 KV S/s work at Rangpo, Sikkim having Transformer capacity of 60/75 MVA X 2 = 150 MVA |
| 6 | Korba west power corporation ltd./Avantha Power & Infrastructure Ltd. Raigarh | 1320 MW Power Plant | Survey & other related activities for modification of 765 kV,400 kV, 220 kV, 132kV lines & HT/LT lines for their Railway crossing. |
| 7 | M/s MSP Steel & Power Ltd.. | 35 MW | Transmission Line 132 kV - 26 Kms along with forest approval & other statutory approvals |
| 8 | M/s R. R. Energy Ltd.. | 15 MW | Transmission Line 132 kV - 11 Kms & statutory approvals |
| 10 | M/s Sarda Energy & Minerals Ltd. | Steel Plant CD-20MVA | Transmission Line 132 kV - 4 Kms Statutory approvals |
| 11 | M/s Shri Bajrang Metallics & Power Ltd.. | CPP 24MVA | Transmission Line 132 kV - 4 Kms |
| 12 | Arya Energy Ltd., Kotma (M.P) | 12 MW Biomass Power plant | (i) 1.2 kms transmission line (ii) 132 kV S/s Switchyard (iii)132 kV Bay at MPPTCL S/sKotma |
| 13 | MSP Sponge Iron Ltd.. | Steel Industry CD-20MVA | 132 kV S/s at Manupali,Raigarh |
| 14 | M/s Chhattisgarh Steel & Power Ltd. | 3X35 MW | (i) 132 kV Transmission Line - 6 Kms (ii) 132 kV Substation& statutory approvals. |
| 15. | M/s Ind Synergy Pvt. Ltd. | CPP 60 MW | 132 kV Transmission Line - 22 Kms along with forest approval & other statutory approvals. |
| 16 | M/S. Prakash Industries Ltd. Champa | 4X25 MW | Construction of 132 kV Double Ckt line. 20 Kms |
| 17 | ACME Solar Energy(MP) Pvt.Ltd., Khilchipur(MP) under MPPTCL | For Solar Power Plant | 132 kV DCSS line – 10 kms |
| 18 | Vandana Energy & Steel, Korba(C.G) | Thermal Power Plant – 35 MW | 132 kV line – LILO D/C |
| 19 | Chief Engineer EHT(C&M), CSPTCL, Raipur (C.G) | C.G Utility Company | Construction of 132 kV DCDS line at Ratanpur, Bilaspur – 5.1 Kms.(Labour Contract). |
| 20 | MPPTCL, Rajgarh(M.P) | NTPC line | 132 kV DCDS line – 4 kms. |
| 21 | CHIEF ENGINEER EHT (C&M) CSPTCL RAIPUR (C.G). | C.G Utility Company | Construction of 220 kV line & 2nd Circuiting of 220 kV line – 14 Km.(Execution Contract) |
| 22 | Nagpur Wires & Transformers, Nagpur | Irrigation Project | Diversion of 132 kV DCDS Ambazari-Amravati line – 1.5 kms |
| 23 | PowerD EPC Services Limited, Betul (Under MPPTCL) | 50 MW Wind Project | Construction of 132 KV Double Circuit line at Bheinsdehi,Betul,(MP) – 23 kms. |
| 24 | Shree Mahalaxmi City Homes Pvt. Ltd. | Real Estate Developer | Diversion of 132 kV line from private land owner |
| 25 | Chhattisgarh Hydropower LLP, Raipur | 132 kV line – 14 Kms 132 kV LILO- 1.5 Kms | 132 kV LILO + Diversion for 132 kV Pooling Substation at Lodhma.- total 15.5 Kms. |
| 26 | MPPTCL | 132 kV line for Railways at Amla (Distt.Betul)- 24 Kms | Construction of 132 KV DCSS- 24 Km |
| 27 | Chhattisgarh Hydropower LLP, Raipur | 24 MW Hydro Power Plant | Route length – 15 Kms (including . LILO & Diversion Work) |
| 28 | CSPTCL / Chhattisgarh Hydropower LLP, Raipur | 132 kV Pooling S/s at Lodhma | Construction of 132 KV Pooling S/s Completed at Lodhma |
| 29 | Chhattisgarh Hydropower LLP, Raipur | 2x12 MW Hydro Power Plant | Construction of 132 kV Switching S/s having Transformer capacity of 20 MVAX2 = 40 MVA at Bene along with the related Engg. & consultancy services. |
| 30 | PowerD EPC Services Limited, Betul (Under MPPTCL) | 50 MW Wind Project | (i) Second Circuitng Work of 23 Kms. (ii) Construction of 132 KV Bay |
| 31 | Nagpur Wires & Transformers (Irrigation Project), Maharashtra | Mokhabardi Irrigation Project | 132 kV DCDS line – 37.5 Kms |
| 32 | CSPTCL | 132 DCDS line from 132 kV S/s Gharghoda to NTPC Talaipali Coal Mines, | Double Circuit 132 kV – 19 Kms. |
| 33 | NTPC, Lara | Shifting of 132 kV line of Ind Synergy Ltd. | 132 kV line shifting for 2.5 Kms |
| 34 | Godawari Power & Ispat ltd. | 132KV DCSS line for connectivity between two units | 132KV DCSS line – 3 Kms. (including monopoles) |
| 35 | M/s Sarda Energy & Minerals Ltd., Raipur. | Modification/shifting | 132 kV line shifting work – 0.812 Km. |
| 36 | M/s Shri Bajarang Power & Ispat Ltd | 132 KV DCSS line from 132 KV S/s at Kuthrel to Plant at Tilda (Chhattisgarh | 132 KV DCSS line – Route length 7 Km. |
| 37 | DCS Limited, Hyderabad | Construction of 33KV OH line on 132KV towers | Route length - 1.4 Km |
| 38 | DCS Limited, Hyderabad | Construction of 33KV OH line on 132KV towers | Route length - 1.14 Km |
| 39 | M/s Hindustan Coils Ltd, Siltara (C.G.) | 132 KV line work-9 Km | 132 KV line -9 Km |
| 40 | Madhya Bharat Power Corporation Limited. | 220 kV Double Circuit for Hydal Power Project at Sikkim | 220KV – 7 Km. – Double Ckt completely on Hilly terrain |
| 41 | CSPTCL (Tender work No.: - TR- 18/28) | 132 DCDS line from 132 kV S/s Thelkadih-Dongargarh to proposed 132KV Sub-station Indamara | Double Circuit 132 kV – 19 Kms. |
| 42 | Sun & Sun Inframetric Pvt. Ltd | 132 KV modification Shifting work at kachna | 132 KV line shifting work for 0.58 Km |
| 43 | M/s SunEdison Infrastructure Pvt. Ltd (Refex Renewables Ltd) | 33KV DC line for 68 MWp Solar PV Plant in Bhilai | 1. Construction of 33 KV Double Circuit Line H-Beam for 68MWp Solar PV Plant in Kumhari Dist- Durg. (Route Length = 4.5 Km) 2. Construction of 2 Nos 33 KV Narrow Base Towers 3. Dismantling & Erection of LM Tower on PGCIL, Kumhari 4. Shifting & construction of 11 KV Line |
| 44 | M/s Godawari Power & Ispat Limited | 132 KV DCSS line Rasmada | Construction of 132 KV transmission line. |
| 45. | Nav Durga Fuel (P) Ltd. Raigarh (C.G.) | 132 KV DCSS line | i. Construction of 132 KV DCSS line from 220/132 KV S/s Gerwani to Nav Durga Plant at Raigarh ii. Construction of 132 KV Switchyard Sub-station having Transformer capacity 31.5 MVA |
| 46. | M/s Godawari Power Ispat Limited, | 132 KV DCSS line | Construction of 132 kV transmission line connecting to 132/33 KV CSPTCL S/s at Bhanupratappur to Aridongari Iron Ore Mines Kacche, Tehsil-Bhanupratappur, Distt- Kanker(C.G.) |
| 47. | SEC Railway, Bilaspur (Joint Venture with M/s Mosh Varya Infrastructure Pvt. Ltd.) | 25 KV, Overhead Electrification (OHE) Work | Electrification works in section between Paniajob (Ex) to Bortalab (Ex) of South East Central Railway in connection with construction of 3rd line between Rajnandgoan- Kalumna |
| 48. | M/s Earthstahl & Alloys Pvt. Ltd. | 132 KV line+ 132/33 KV Substation | i. Construction of 132 KV line Connectivity from CSPTCL 132/33 KV S/s Simga to M/s Earthstahl & Alloys Pvt. Ltd. plant at village Duldula, Baloda Bazar (C.G.) (RL approx - 1.8 Km) ii. Construction of 132 KV Switchyard S/S having Transformer capacity of 31.5 MVA & other related activities |
| 49 | M/s FP Samruddi Pvt Ltd | 132 KV Bay work at 220/132 KV Mungeli S/s | Construction of 132 KV Bay at 220/132 KV CSPTCL S/s, Mungeli (C.G.) for 50 MW (AC) Solar Plant. |
| 50. | M/s Oriano Clean Energy Pvt Ltd | 132 KV Line DCSS | Construction of 132KV DCSS line at Mungeli (C.G.) for 50 MW (AC) Solar Plant.(Route Length = 8.5 Km) |
| 51. | Chhattisgarh Hydropower LLP, Raipur | 132 KV DCSS Line | Construction of of 132KV DCSS line for Rehar- I, 3x8.3MW SHP, Dist.- Surajpur (C.G.) |
| 52. | Godawari Power & Ispat Ltd | 132 KV Monopole work at Siltara (C.G.) | Construction of 132KV Monopole for 132KV Single Circuit transmission line suitable for ACSR Panther Conductor for Raipur Chhattisgarh Location (wind zone – 3 & Seismic Zone- 2). |
| II. Work Under progress | |||
| 1 | M/s Sarda Energy & Minerals Ltd | 132 KV DCSS line & 132 KV Switchyard S/s for 50 MWp Solar Plant | 1.) Construction of 132KV DCSS transmission line From CSPTCL 132/33 KV S/s MathKharora to proposed solar power plant of M/s SEML at village Kharora, Dist –Raipur 2.) Construction of 132 KV switchyard S/s for SEML having Transformer capacity of 90 MVA |
| 2. | M/s B.S. Sponge | 132 KV DCSS line | Construction of 132 KV DCSS transmission line from CSPTCL 220/132/33 KV S/s Gerwani to M/s B.S. Sponge Pvt. Ltd. Village-taraimal, District-Raigarh on Turnkey Basis (RL approx – 5.985 Km) |
| 3. | M/s Shree Rupanadham Steel Pvt. Ltd. | 132 KV DCSS line & 132 KV Switchyard S/s | i) Construction of 132 KV DCSS Line from CSPTCL 220/132/33 kV S/s Gerwani to Raigarh plant. ii)132 KV/33 KV Switchyard S/s on Turnkey basis at Village Saraipali, Tehsil-Tamnar, Distt.: Raigarh (CG) RL=1.610 +Second Circuiting =7.620 KM |
| 4. | NRVS Steels Limited | 132 KV DCSS LINE + 132KV/33 KV Substation | i.) Construction of 132KV DCSS Iine along with Design, Engineering, supply & Technical Consultancy for construction on turkey basis ii.) Construction of 132KV Switchyard S/s. |
| 5. | M/s Chandrahasini Ispat Pvt. Ltd | 132 KV DCSS line | Construction of 132 DCSS line from Gerwani S/s to M/s Chandrahasini Ispat Pvt. Ltd steel Plant at Village- vill. Taraimal, Dist. Raigarh (C.G.) on turnkey basis (involve s Forest Clearance Approval)-RL-1.7 Km |
| 6. | CSPTCL (Tender work No.: - TR-24/14) | 132 KV DCDS line | Construction of 132 KV DCDS line on Panther Conductor from existing 132/33 KV substation Bhendra (Gharghoda) to Baroud Open Cast Mines on request of M/s SECL Raigarh (Approx. 20 Km.) on turn-key basis |
| 7. | KSL Cleantech Private Limited | 132 KV Switchyard Substation | Construction of 132KV Switchyard S/s at Saraipali, Dist-Raigarh |
| 8. | Ampin Energy Transition Private Limited | 33 KV S/C Transmission line & 33 KV Bay CSPTCL | i.) Construction of 33 KV S/C Iine along with Design, Engineering, supply & Technical Consultancy for construction on turkey basis ii.) Construction of 33 KV Bay at 132/33 KV Khairagarh S/s on EPC Basis |
| 9. | Godawari Energy Limited | 220 KV DCSS Transmission Line at Bojia , Raigarh | Construction of 220 KV DCSS transmission line from 250 MWp proposed Solar Power Project of M/s Godawari Power & Ispat Ltd. at Village- Bojia to CSPTCL 220/132/33 KV S/S Gerwani, District - Raigarh (C.G.) Route Length Aprox -36 KM. |
| 10. | Godawari Power & Ispat Ltd | 220 KV DCSS line sat Village- Sarora, Tehsil- Tilda (C.G.) | Construction of 220 KV DCSS line from CSPTCL 400/220 KV S/s Raita to Switchyard of upcoming Integrated Steel Plant of M/s Godawari Power & Ispat Ltd. at Village- Sarora, Tehsil- Tilda (C.G.) Approx. Route Length – 16.5 Km |
| III. Maintenance Work of 132 KV transmission line | |||
| 1. | M/s R.R. Energy Ltd, Raigarh (C.G.) | Patrolling & Maintenance of 132 KV line on monthly basis. | Carrying out this work since 2008 |
| 2. | M/s Ind Synergy Ltd., Raigarh(C.G.) | Patrolling & Maintenance of 132 KV line on monthly basis. | Carrying out this work since 2018 |
| 3. | API Ispat and Powertech Private Limited | Maintenance of 3 Nos. Monopole | For maintenance of three (03) Monopoles of 132KV Line From 132/33 KV CSPTCL Grid Substation (Api Ispat Siltara) |