{"id":70,"date":"2018-04-25T12:23:37","date_gmt":"2018-04-25T12:23:37","guid":{"rendered":"http:\/\/demo.acmethemes.com\/construction-field\/?page_id=308"},"modified":"2026-01-01T05:09:44","modified_gmt":"2026-01-01T05:09:44","slug":"our-consultancy-services-general","status":"publish","type":"page","link":"https:\/\/powersolengineers.com\/new\/our-consultancy-services-general\/","title":{"rendered":"Our Consultancy Services (General)"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\"><strong>Our Consultancy Services (General)<\/strong><\/h2>\n\n\n\n<ul class=\"ul_circle_content\">\n<li style=\"text-align: justify;\">Complete consultancy for biomass\/solar projects etc. \n<\/li>\n<li style=\"text-align: justify;\">Works related to power evacuation systems and Long Term &#038; Short-Term Open Access.\n<\/li>\n<li style=\"text-align: justify;\">Getting Power flow studies through PGCIL, CSEB &#038; MPSEB for making power system studies for Long-term Open Access \/ connectivity with their systems.\n<\/li>\n<li style=\"text-align: justify;\">Facilitating in obtaining all statutory &#038; non-statutory clearances required for setting up of a Coal Based \/ Bio-mass \/ Solar Power Plant.\n<\/li>\n<li style=\"text-align: justify;\">Works related to land acquisition, conducting detailed study for preparation of Rehabilitation and Resettlement Schemes for setting up of any type of power plant. \n<\/li>\n<li style=\"text-align: justify;\">Dealing with Regulatory affairs i.e. with CERC, CSERC, Appellate Authorities, New Delhi etc.\n<\/li>\n<li style=\"text-align: justify;\">Consultancy related to various approvals like Registration from CREDA, EHV connectivity, power flow evacuation etc.\n<\/li>\n<li style=\"text-align: justify;\">Preparation of Techno-Economic Feasibility Report (TEFR) for Power Plants of various capacities.\n<\/li>\n<li style=\"text-align: justify;\">Preparation of Detailed Project Report (DPR) for Thermal \/ Solar Power Project of various capacities ranging upto 660 MW (Supercritical).\n<\/li>\n<li style=\"text-align: justify;\">Dealing with Renewable Energy incentives, CDM etc. and related to Renewable Energy Certificate (REC). \n<\/li>\n<li style=\"text-align: justify;\">Consultancy services in regard to survey &#038; RoW for EHV, erection of tower lines &#038; other infrastructure works.\n<\/li>\n<li style=\"text-align: justify;\">Facilitating in obtaining forest clearance Stage-I and stage-II including complete consultancy for                                Transmission Lines and power Projects.\n<\/li>\n<li style=\"text-align: justify;\">Selection of suitable site for the power projects (including Solar Projects), optimizing the site, based on essential techno-economic considerations.\n<\/li>\n<li style=\"text-align: justify;\">Arranging short term \/ long term Power Purchase Agreements with end users\/ needy States, for selling of generated power, at attractive rates. Facilitating investors to enter into MoU \/ PPA through competitive bidding.\n<\/li>\n<li style=\"text-align: justify;\">Interstate Power Trading on short term \/ long-term basis.\n<\/li>\n<li style=\"text-align: justify;\">Complete consultancy for the projects of EHV lines &#038; Sub-station for electrification for construction power, start power including their execution on Turnkey Basis.\n<li>\n<\/ul>\n\n\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Lorem ipsum dolor sit amet, consectetur adipisicing elit<\/p>\n","protected":false},"author":1,"featured_media":362,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-70","page","type-page","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/powersolengineers.com\/new\/wp-json\/wp\/v2\/pages\/70","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/powersolengineers.com\/new\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/powersolengineers.com\/new\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/powersolengineers.com\/new\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/powersolengineers.com\/new\/wp-json\/wp\/v2\/comments?post=70"}],"version-history":[{"count":11,"href":"https:\/\/powersolengineers.com\/new\/wp-json\/wp\/v2\/pages\/70\/revisions"}],"predecessor-version":[{"id":391,"href":"https:\/\/powersolengineers.com\/new\/wp-json\/wp\/v2\/pages\/70\/revisions\/391"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/powersolengineers.com\/new\/wp-json\/wp\/v2\/media\/362"}],"wp:attachment":[{"href":"https:\/\/powersolengineers.com\/new\/wp-json\/wp\/v2\/media?parent=70"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}