One of the renowned Raipur (Chhattisgarh) based consultancy service providers in Central India, professionally managed, an ISO 9001:2008 Certified Company, engaged in execution of EHV lines & Substations on turnkey basis along with the related consultancy services. The company has also been rendering consultancy services in multifarious fields of Power Sector, particularly in respect of all the pre-implementation activities for setting up of Power Plants including Biomass / Solar PV etc along with consultancy related to power evacuation, Long Term / Short Term Open Access, Inter-State Power Trading,  Regulatory affairs etc.
 
Activities: –
Site selection based on techno-economic considerations for power/other projects, , preparation of Techno-economic Feasibility report, DPR, Rehabilitation & Resettlement Plan, various statutory & non-statutory clearances, Power evacuation plan, Power Trading, Long Term Open Access, Short Term Open Access, Construction of Transmission line and EHV S/s on EPC etc. including forest clearance from MoEF for the following:-

(A) RELATED TO EXECUTION OF EHV TRANSMISSION LINES AND SUBSTATIONS WORKS (ON EPC Basis)

I. Work already completed
S.N.Name of ClientsCapacityName of Work
1Sterlite Powergrid Ventures Ltd.Modification of 765 KV S/c Quad Dhule-Aurangabad Transmission lineModification work of 765 KV S/c Quad transmission line for National Highway (NHAI)
2Chief Engineer, EHT (C&M) MPPTCL JABALPURM.P Utility CompanyModification of
(I) 220 kV Sarni-Pandurna line .
(ii) 132 kV Sarni- Chindwara line
(iii) 132 kV Sarni-Betul line
(iv) 132 kV Sarni-Ghodadongari traction line by using multi-circuit towers (Labour Contract)
3BSCPL Infrastructure Ltd.National Highway Crossing on Chhattisgarh- Orissa BorderModification of various lines of 132 KV & 220KV lines for National Highway (NHAI) Crossing
4Alstom T & D India Ltd..For CSPTCL, ChhattisgarhConstruction of 220 Sub-station at Chhuri with 18 Nos. 220 kV Bays & 13 Nos. 132 kV Bays
5Madhya Bharat Power Corporation Limited, Raipur(C.G.)220 KV Switchyard work at SikkimConstruction of 220 KV S/s work at Rangpo, Sikkim
6Korba west power corporation ltd./Avantha Power & Infrastructure Ltd. Raigarh1320 MW Power PlantSurvey & other related activities for modification of 765 kV,400 kV, 220 kV, 132kV lines & HT/LT lines for their Railway crossing.
7M/s MSP Steel & Power Ltd..35 MWTransmission Line 132 kV - 26 Kms along with forest approval & other statutory approvals
8M/s R. R. Energy Ltd..15 MWTransmission Line 132 kV - 11 Kms & statutory approvals
10M/s Sarda Energy & Minerals Ltd.Steel Plant CD-20MVATransmission Line 132 kV - 4 Kms Statutory approvals
11M/s Shri Bajrang Metallics & Power Ltd..CPP 24MVATransmission Line 132 kV - 4 Kms
12Arya Energy Ltd., Kotma (M.P)12 MW Biomass Power plant(i)     1.2 kms transmission line
(ii)    132 kV S/s Switchyard
(iii)132 kV Bay at MPPTCL S/sKotma
13MSP Sponge Iron Ltd..Steel Industry CD-20MVA132 kV S/s at Manupali,Raigarh
14M/s Ind Synergy Pvt. Ltd.CPP 60 MW132 kV Transmission Line - 22 Kms along with forest approval & other statutory approvals.
15M/S. Prakash Industries Ltd. Champa4X25 MWConstruction of 132 kV Double Ckt line. 20 Kms
16ACME Solar Energy(MP) Pvt.Ltd., Khilchipur(MP) under MPPTCLFor Solar Power Plant132 kV DCSS line – 10 kms
17Vandana Energy & Steel, Korba(C.G)Thermal Power Plant – 35 MW132 kV line – LILO D/C
18Chief Engineer EHT(C&M), CSPTCL,
Raipur (C.G)
C.G Utility CompanyConstruction of 132 kV DCDS line at Ratanpur, Bilaspur – 5.1 Kms.(Labour Contract).
19MPPTCL, Rajgarh(M.P)NTPC line132 kV DCDS line – 4 kms.
20CHIEF ENGINEER EHT (C&M) CSPTCL RAIPUR (C.G).C.G Utility CompanyConstruction of 220 kV line & 2nd Circuiting of 220 kV line – 14 Km.(Execution Contract)
21Nagpur Wires & Transformers, NagpurIrrigation ProjectDiversion of 132 kV DCDS Ambazari-Amravati line – 1.5 kms
22PowerD EPC Services Limited, Betul (Under MPPTCL)50 MW Wind ProjectConstruction of 132 KV Double Circuit line at Bheinsdehi,Betul,(MP) – 23 kms.
23Shree Mahalaxmi City Homes Pvt. Ltd.Real Estate DeveloperDiversion of 132 kV line from private land owner
24Chhattisgarh Hydropower LLP, Raipur132 kV line – 14 Kms 132 kV LILO- 1.5 Kms132 kV LILO + Diversion for 132 kV Pooling Substation at Lodhma.- total 15.5 Kms.
25MPPTCL132 kV line for Railways at Amla (Distt.Betul)- 24 KmsConstruction of 132 KV DCSS- 24 Km
26CSPTCL / Chhattisgarh Hydropower LLP, Raipur132 kV Pooling S/s at LodhmaConstruction of 132 KV Pooling S/s Completed at Lodhma
27Chhattisgarh Hydropower LLP, Raipur2x12 MW Hydro Power PlantConstruction of 132 kV Switching S/s at Bene along with the related Engg. & consultancy services.
28PowerD EPC Services Limited, Betul (Under MPPTCL)50 MW Wind Project(i) Second Circuitng Work of 23 Kms.
(ii) Construction of 132 KV Bay
29Nagpur Wires & Transformers (Irrigation Project), MaharashtraMokhabardi Irrigation Project132 kV DCDS line – 37.5 Kms
30Chhattisgarh State Power Transmission Company Limited, (C.S.P.T.C.L.) Chhattisgarh132 DCDS line from 132 kV S/s Gharghoda to NTPC Talaipali Coal Mines,Double Circuit 132 kV – 19 Kms.
31NTPC, LaraShifting of 132 kV line of Ind Synergy Ltd.132 kV line shifting for 2.5 Kms
32Godawari Power & Ispat ltd.132KV DCSS line for connectivity between two units132KV DCSS line – 3 Kms. (including monopoles)
33M/s Sarda Energy & Minerals Ltd., Raipur.Modification/shifting132 kV line shifting work – 0.812 Km.
34M/s Shri Bajarang Power & Ispat Ltd132 KV DCSS line from 132 KV S/s at Kuthrel to Plant at Tilda (Chhattisgarh132 KV DCSS line – Route length 7 Km.
35DCS Limited, HyderabadConstruction of 33KV OH line on 132KV towersRoute length - 1.4 Km & 1.14 Km
36M/s Hindustan Coils Ltd, Siltara (C.G.)132 KV line work-9 Km132 KV line -9 Km
37Madhya Bharat Power Corporation Limited., Sikkim220 kV Double Circuit for Hydal Power Project at Sikkim220KV – 7 Km. – Double Ckt completely on Hilly terrain
38CSPTCL (Tender work No.: - TR-18/28)132 DCDS line from 132 kV S/s Thelkadih-Dongargarh to proposed 132KV Sub-station IndamaraDouble Circuit 132 kV – 19 Kms.
39Sun & Sun Inframetric Pvt. Ltd132 KV modification Shifting work at kachna 132 KV line shifting work for 0.58 Km
40M/s SunEdison Infrastructure Pvt. Ltd33KV DC line for 68 MWp Solar PV Plant in Bhilai (Railway Work)Construction of 2 Nos. Narrow Base Tower
41M/s Godawari Power & Ispat Limited132 KV DCSS lineConstruction of 132 KV transmission line.
 
II. Work in progress
S.N.Name of ClientsCapacityName of Work
I.Chhattisgarh Hydropower LLP, Raipur132 KV DCSS Line- 32 KmConstruction of of 132KV DCSS line for Rehar- I, 3x8.3MW SHP, Dist.- Surajpur (C.G.)
IINav Durga Fuel (P) Ltd. Raigarh (C.G.)132 KV DCSS line – 9 KmConstruction of 132 KV DCSS line from 220/132 KV S/s Gerwani to Nav Durga Plant at Raigarh including Forest Clearance.
III.M/s SunEdison Infrastructure Pvt. Ltd33 KV D/C transmission line 220 KV DCSS line33 KV D/C transmission line on H-Beam for Solar Plant Construction of 220 KV DCSS Transmission line from 220KV Pooling S/s to 220KV PGCIL Bay Kumhari, near PGCIL Kumhari, Bhilai (C.G.)
IV.SEC Railway, Bilaspur (Joint Venture with M/s Mosh Varya Infrastructure Pvt. Ltd.)25 KV, Overhead Electrification (OHE) WorkElectrification works in section between Paniajob (Ex) to Bortalab (Ex) of South East Central Railway in connection with construction of 3rd line between Rajnandgoan- Kalumna
 
III. Maintenance Work of 132 KV transmission line
S.N.Name of ClientsCapacityName of Work
1.)M/s R.R. Energy Ltd, Raigarh (C.G.)Patrolling & Maintenance of 132 KV line on monthly basis.Carrying out this work since 2008
2.)M/s Ind Synergy Ltd., Raigarh(C.G.)Patrolling & Maintenance of 132 KV line on monthly basis.Carrying out this work since 2018
 

(B) RELATED TO LONG /SHORT TERM OPEN ACCESS(STOA)/OTHER RELATED CONSULTANCY

S.N.NAME OF CLIENTSPARTICULAR OF WORKS
1M/s CHHATISGARH STEEL & POWER LTD. (30 MW) Open access/Power Trading
2M/s REAL ISPAT & POWER LTD.STOA / Power Trading
3M/s SKS ISPAT POWER LTD.STOA / Power Trading
4M/s LAHARI POWER & STEEL LTD.STOA / Power Trading
5M/s SHRI BAJRANG POWER & STEEL LTD.STOA /Power Trading
6M/s SINGHAL ENERGY PVT LIMITED , RAIPUR (16 MW)PGCIL/Long Term Open Access
7M/s MARUTI CLEAN COAL & POWER LTD.PGCIL/Long Term Open Access
8M/s MAHENDRA SPONGE IRON & POWER LTD.Short Term Open Access
9M/s RASHMI SPONGE IRON & POWER LTD.Short Term Open Access
10M/s VASHWANI SPONGE IRON & POWER LTD.Short Term Open Access
11M/s GOPAL SPONGE IRON & POWER LTD.Long Term Open Access
12M/s BALDEO SPONGE IRON & POWER LTD.Long Term Open Access
13M/S BHAWATI POWER & STEEL LTD, RAIPURLong Term Open Access
14M/S. AGIO PAPER & INDUSTRIES LTD. , BILASPUR/KOLKATAPower evacuation & Open Access
15M/S. DEVI SPONGE & POWER PVT. LTD.Dedicated connectivity & Synchronization of 8 MW & Open Access
16M/s SAI CHEMICALS, RAJNANDGAON Power Trading
17M/s SESHASAILA POWER & ENGINEERING (P) LTD., RAIPURPower Trading / Open access
18M/s ARORA / INDRA POWERGEN (P) LTD.Power Trading / Open access
19M/s MSP STEEL & POWER LTD.Power Trading / Open access
20M/s MAHAVIR ENERGY & COAL BENEFICATION LTD.Power Trading / Open access
21M/s ARYA ENERGY LTD. Consultancy related to Drawing, Design & connectivity for 132 kV line and S/s and their testing & commissioning.
22M/s Ind Synergy Ltd.,Short Term Open Access

(C) RELATED TO SOLAR POWER PROJECTS

S.N.NAME OF CLIENTSCAPACITYPARTICULARS OF WORK
1M/s FP UTTAR SOLAR PVT. LTD. SPV of Fourth Partner Energy Pvt. Ltd.90 MWAll the activities including CREDA approval, Land Selection, Land Aggregation, 132 KV/220 KV connectivity approval, Survey work for EHT line and all consultancy work related to Solar power Plant
2M/s FP SAMRUDDI PRIVATE LTD. SPV of Fourth Partner Energy Pvt. Ltd.75 MWAll the activities including CREDA approval, Land Selection, Land Aggregation, 132 KV/220 KV connectivity approval, Survey work for EHT line and all consultancy work related to Solar power Plant
3M/s FP Orka PRIVATE LTD. SPV of Fourth Partner Energy Pvt. Ltd.75 MWObtaining CREDA approval, 132 KV connectivity approval, Survey work for EHT line and all consultancy work related to Solar power Plant
4Amplus Helios Pvt. Ltd.70 MWpConsultancy work related to Solar power Plant – connectivity approval, CREDA Registration, Approvals Us/68 & 164, CEIG Approval etc.
5Oriano Clean Energy Pvt. Ltd.70 MWpDetailed Survey & related activities required for approval of 132 KV connectivity for proposed solar power plant
 
(D) COAL BASED POWER PROJECTS

Abbreviations:

1) SS – Site Selection

2) TEFR – Techno Economic Feasibility Report

3) OA – Other Clearance Activities

4) DPR – Detailed Project Report

Sr. No.Name of clientsCapacityAssigned work
1M/s OASYS POWER LTD., KOLKATA540 MWSS+TEPFR
2M/s PATNI PROJECTS PVT. LTD., MUMBAI540 MWSS+TEPFR
3M/s ZOOM DEVELOPERS PVT. LTD., NEW DELHI1200 MWSS+TEPFR
4M/s ADITYA BIRLA POWER CO. LTD., MUMBAI1000 MWSS+TEFR + DPR
5M/s THE INDURE PVT. LTD. (DESEIN), NEW DELHI1000 MWSS+TEFR
6M/s ANKIT POWERTECH PVT. LTD., RAIPUR540 MWSS+TEFR+OA
7M/s HIND ENERGY & COAL BENEFICIATION PVT. LTD., BILASPUR70 MWTEFR + SSR + OA
8M/s AES (INDIA) (P) LTD., GURGAON1200 MWSS+TEFR+OA
9M/s BLA CHHATTISGARH THERMAL POWER PVT. LTD., MUMBAI540 MWSS +TEFR+OA
10M/s BEC POWER PVT. LTD., MUMBAI505 MWSS+ TEFR+OA + DPR
11M/s CHHATTISGARH STEEL & POWER LTD., RAIPUR105 MWSS +TEFR+OA+DPR
12M/s DCM SHRIRAM CONSOLIDATED LTD., NEW DELHI1200 MWSS +TEFR+OA
13M/s SJK POWERGEN PVT. LTD., HYDERABAD1000 MW (in MP)SS +TEFR+OA + DPR
14M/s SURYACHAKRA POWER CORP. LTD., HYDERABAD270 MWSS +TEFR+OA
15M/s CHAMBAL INFRASTRUCTURE VETURES LTD., NEW DELHI1200 MWSS +TEFR+OA
16M/s IND-BARATH ENERGIES LTD., HYDERABAD600 MWSS +TEFR+OA
17M/s SONA POWER PVT. LTD., RAIPUR600 MWSS +TEPFR+OA+DPR
18M/s JAIN ENERGY (CHHATTISGARH) PVT LTD., KOLKATA1200 MW

1320MW (M.P)

1320 MW(CG)
SS+ TEFR+OA+DPR
19M/s JSW ENERGY LTD., MUMBAI1200 MW(CG)SS+TEFR+OA
20M/s GVK POWER PVT.  LTD., HYDERABAD1200 MWSS+TEPFR
21M/s TRN ENERGY PVT. LTD. NEW DELHI625 MWSS+ TEFR+OA
22M/s MW INFRAHOLDINGS PVT. LTD., NEW DELHi540 MWSS+ TEFR+OA
23M/s ECE INDUSTRIES LTD., KOLKATA900 MWSS+ TEFR+OA
24M/s TANISH ARYAN POWER PVT. LTD., MUMBAI600 MWSS+ TEFR
25M/s LORDS POWER PVT. LTD, RAIPUR70 MWSS+ TEFR+OA
26M/s MSP STEEL & POWER LTD.1000 MW(MP)SS+ TEFR+OA
27Shree Lakshmi Power Limited, Bilaspur100/120 MWSS+ TEFR+OA
28M/s VEN POWER PVT LIMITED, HYDERABAD1320 MWSS+TEFR
29SHREE CEMENT LIMITED, BEAWAR, (RAJ)1320 MWSS+TEFR
30M/S FACOR ALLOYS LIMITED, NEW DELHI350 MWDPR+OA
31M/S SKY ALLOYS & POWER PVT LTD, RAIPUR35 MWSS+ TEFR
32M/S LANCO SOLAR PVT LTD, HYDERABAD (CPP)150 MWSS+ TEFR+OA
33M/S COSMOS CASTING (INDIA) LTD, RAIPUR2 X 250 MWSS+ TEFR+DPR+OA
34M/S MARS POWER & STEEL LIMITED, RAIPUR (CPP)50 MWSS+ TEFR+OA
35M/s GMR CHHATTISGARH ENERGY PVT. LTD.1300 MWLTOA, PPA, Start-up power etc
36S.M. INFRA POWER (I) PVT. LTD., MUMBAI660 MWSS+ TEFR+DPR+OA
37M/S. P.R. INFRASTRUCTURE LTD., CHANDIGARH240 MWSS+ TEFR
38M/S. HIRA POWER & STEEL LTD., RAIPUR37.5 MWSS+ TEFR
39M/S. GONDWANA POWER & STEEL LTD.50MWSS+ TEFR+OA
40M/S. SONA POWER PVT. LTD. , RAIPUR(660 MW DPR WORK)
Revised –
1320 MW in
CG. TPP
SS+TEFR+OA+DPR
41HCC INFRASTRUCTURE CO.LTD., Mumbai1320 MWSs + TEFR + OA
42M/S SARDA ENERGY & MINERALS LTD., RAIPUR2x350 MW TPP at Kolam (C.G)(i) Survey of 400 kV line(9.5 kms)
(ii)  Consultancy

(E) BIOMASS BASED / SOLAR / HYDRO POWER PROJECTS

Sr. No.Name of clientsCapacityAssigned work
1M/s Shripur Power Project, Birbera8 MW BiomassProject execution
2M /S SESHASAILA POWER & ENGINEERING (P) LTD., RAIPUR8 MW Champa (C.G.)SS+TEFR +DPR+OA
3M/S SSE NIRMAN PVT LTD, KOLKATA2 X 2 MW (SOLAR)SS +DPR+OA
4M/ S CHHATTISGARH ENERGY CONSORTIUM PVT LTD., MahanHydro Power Project -5MWFor Connectivity
5 M/S MAINPAT ENERGY CONSORTIUM PVT. LTD., Mainpat7.50 MW For Connectivity
6M/S NORTH EAST HYDRO ENERGY PVT. LTD., Gagar 6 MW For Connectivity
7M/S SHAKAMBARI POWER LTD.1X2MW
(SOLAR)
SS+DPR+OA
8M/S BEYANT HOLDING & FINANCE LTD.1X2MW
(SOLAR)
SS+DPR+OA
9M/S SONA WINES LTD.1X 2MW(Solar)SS+DPR+OA
10M/s AMVENSYS TECH. PVT. LTD., Tilda, Dist. Raipur (C.G)1x 2 MW(Solar)Complete consultancy
11M/s ABHINAV GREEN POWER (INDIA) PVT.LTD.1X 5 MW (Solar)Complete consultancy
12M/S CHHATTISGARH STEEL & POWER LTD.1 x 2MW (Solar)Complete consultancy
13M/s Nachiketa Steel & Power, Bilaspur.8 MW Gen. + 30 MW steel mfg. activitiesFeasibility study for 132 kV connectivity

(F) FOREST CLEARANCE From MOEF

S.N.NAME OF CLIENTSPARTICULAR OF WORKSPresent Status
1 CSPGCL / CSEBFor Power Plant, pertaining to M/s India Bulls 1200 MW TPP (BHAIYATHAN) Work Completed
2M/s Ind-Synergy Ltd.For Transmission Line of 132 KVWork Completed
3M/s MSP Steel & Power LtdFor Transmission Line of 132 KVWork Completed
4M/s BEC Power Pvt. Ltd.Wildlife ClearanceWork Completed
5M/s Nav Durga Fuel (P) Ltd. Raigarh (C.G.)For Transmission Line of 132 KVWork under Progress
6M/s Chhattisgarh Hydro Power LLPFor Transmission Line of 132 KVWork under Progress
7M/s B.S. Sponge Pvt. LtdFor Transmission Line of 132 KVWork under Progress

(G) REGULATORY AFFAIR CASES

S.N.NAME OF CLIENTSPARTICULAR OF WORKS
1M/s RR Energy LtdSucceeded in getting refund of 15% supervision charges worth more than Rs. 80.00 Lacs
2M/s Gopal Sponge& Power Ltd.Succeeded in obtaining Open access from CSERC
3M/s Ind Synergy Pvt. Ltd.Succeeded in waival of cross subsidy charges worth Rs. 44.00 Lacs
4M/s Indsynergy Pvt. Ltd.Succeeded in obtaining Open access on 33kVthrough 33/11kV substation
5M/s Biomass power Generation AssociationSucceeded in getting the tariff enhanced by 76 paisa / unit
6M/s Baldev Alloys Pvt.Ltd.Succeeded in obtaining approval of higher load up-to 14 MW on 33 kV
7CREDAIWaival of the cost of 33 / 11 kV S/s being charged from the Builders – Case is in process
8M/s Chhattisgarh Steel & Power Ltd.Refund of excess amount against 132 kV connectivity – Case in progess.